Replace Diakin Chillers

Projects / Replace Diakin Chillers
Onsite Construction Group
Location
Fargo, North Dakota
Sector
Federal
Owner
US Postal Service
Delivery
Design-Build
Project Overview

A complex chiller replacement in a live federal facility.

Fargo ND Chiller Replacement project included removal and replacement of a 375 ton chiller & 30hp 1115 gpm pumps at the Fargo ND Medical Distribution Center. Due to the inaccessible location of the existing chiller an opening would have to be cut in an 8” CMU wall to provide access for the new 11,366lb chiller to the Mechanical Room. Once the chiller was unloaded it was rolled through the building to the opening in the CMU wall where a temporary ramp was built to lower the chiller 48” to the mechanical pit below. This project included asbestos abatement of the old pipe insulation, mastic, and tile floors and installation of new Hydronic piping to connect the new chiller. New 460v 3 phase 500amp electrical connection was also provided by Onsite Construction Group to power the new Chiller & Pumps.

Related Projects