Replace Air Handler AC 3 & 4

Projects / Replace Air Handler AC 3 & 4
Onsite Construction Group
Location
Columbia, Missouri
Sector
Healthcare
Owner
Department of Veterans Affairs
Delivery
Project Overview

Multi-phase 7th-floor penthouse air handler replacement.

This project was for replacing the air handling units AC-S3 and AC-S4 for the Harry S Truman Medical Center located at 800 Hospital Drive in Columbia, Missouri. The units were located on the 7th-floor penthouse, where we provided temporary conditioned air to the space served by the existing air handler. Once the units were decommissioned, we installed and tested the new units. Onsite’s team re-connected the discharge ductwork to the unit while completing the testing and balancing and commission of the new units. This project consisted of 4 different phases that required careful planning and scheduling to minimize the downtime of conditioned air in the space served by the AHU’s.

During phase 1, we penetrated the penthouse wall and routed the ductwork from the existing temporary air handler on the roof to the proximity of the discharge piping of the current unit. In phase 2, we shut down the original unit, switched ductwork connections from the temporary unit, and completed the startup for the temporary unit. Phase 3 decommissioned the old unit and installing the new unit, which consisted of performing startup and testing processes for the new unit. In phase 4, Onsite switched the ductwork from the temporary unit back to the new units in conjunction with testing and balancing the new units.

Related Projects