Z2DA Remodel Cath Lab

A comprehensive two-room cath lab reconfiguration under active clinical operations.
Onsite removed the equipment in the two existing Cath Labs and demolished the infrastructure for the existing restrooms, Cath Labs, and control rooms. Onsite reconfigured the wall locations and lead shielding in accordance to the plans and specifications for the new Cath Lab Equipment. Onsite installed sound control door assemblies and systems for a Healthcare Vacuum and a Waste Anesthesia Gas Disposal (WAGD) system in conjunction with completing the starting and testing for the systems to ensure they were ready for use. Onsite installed and performed TAB of new HVAC Systems. Electrical requirements for the new equipment was met along with new Fire Suppression System and Plumbing.
During this project, the VA requested a modification to correct unanticipated conditions and discrepancies. This included additional fireproofing, filling the electrical trench with concrete to level the flooring, and increasing the main piping size while relocating the medical gas valve box, modifying the supply duct, and relocating Ductwork in conflict with the MSA floor plate location. Our team added a medical alarm, nurse call dome lights, and door operators in conjunction with altering systems to VFD’s, installing Fire Damper Power, and running 24V power from JCI’s transformer to VAV boxes.